Where the cable exits the borehole, we’re planning to route it into PVC pipe.
The standard PVC sweep used by electricians in the construction industry should be fine. These typically have a 6-inch radius. The problem is not the minimum radius itself, but the friction in pulling cable through the bend. Also, it is a good idea to allow a little slack cable for settlement and other movements.